C.3.2 Septic system inventory
C.6.1 Repair report to Sanitary District
C.10.1 Storm drain labeling
C.10.2 Storm drain inlet construction standard
C.10.3 Spill reporting procedures
Construction Site Erosion and Sediment Controls
D.2.1 Pre-construction briefings
D.2.2 Project Manager training
D.2.3 Stormwater Management Team meeting
D.2.4 SWPPP requirement
D.4.1 SWPPP review
D.5.1 Construction site spill reporting
D.6.1 Enforce contractor requirements
D.6.2 Site inspections
D.6.3 Non-compliance procedures
BMPs continued on Page 2
Public Education and Outreach
A.1.1 Fact sheet
A.1.2 Press release
A.1.3 Website
A.2.2 Presentations
A.3.1 Radio Public Service Announcement
A.4.1 Campus booth or presentation
A.6.1 Logo and Mission Statement
Public Participation and Involvement
B.1.1 Campus surveys
B.3.1 Sustainable Committee participation
B.6.1 MS4 meetings
Illicit Discharge Detection and Elimination
C.1.1 Storm sewer system maps
C.2.1 Prohibit illegal discharges to storm sewer system
C.2.2 Enforcement for illegal discharges
C.3.1 Identify priority areas likely to have illicit discharges