Contact Us
©Copyright2006 University of Illinois Safety & Compliance

A/E's & Contractors
Erosion and sediment control is vital to keeping campus waterways clean. As part of the University's stormwater permit, campus construction standards incorporate federal and state erosion and sediment control requirements.

Other Links:

Pollution Prevention at Construction Sites

REQUIRED DOCUMENTS

RECORDKEEPING

Construction Sites Greater than One Acre
Construction sites that disturb one acre or more require a Stormwater Pollution Prevention Plan (SWPPP) and Notice of Coverage. These must be in place before breaking ground.

All Construction Sites
All construction sites must provide the following to prevent sediment from entering the storm sewer:

           Stabilized entrance: A well-maintained stabilized              entrance reduces off-site sediment tracking.
           Street sweeping: Remove any debris tracked onto the             street by the end of the day.
           Filters for pumped groundwater: Discharging cloudy              water to the storm sewer is prohibited.
           Preserve existing vegetation: Vegetative strips are              often the least expensive erosion control technique.