Facilities & Services Home Page University of Illinois Home Page
Go to the Facilites & Services Home Page
 
Projects in Planning
 

(41)
 
(1)   Allerton 4-H Dining Hall Renovation
(2)   Altgeld Hall Electrical Service Upgrade
(3)   Altgeld Hall Fire Alarm Upgrade
(4)   Armory Limited Renovation of Restrooms, Windows, Doors and Floors
(5)   BSL3 Biocontainment Laboratory
(6)   Burrill Hall Infastructure and First Floor Repairs
(7)   Chemistry Annex Slate Roof Replacement
(8)   Education Building HVAC Replacement Phase I & II
(9)   English Building Interior and Exterior Repairs
(10) Everitt Lab Electrical Systems Replacement Design
(11) Everitt Lab Life Safety
(12) FAR Oglesby Traction Elevator Replacement
(13) Foreign Language Building Life Safety and HVAC Remeditation
(14) Freer Hall Third Floor South Gym Remodel
(15) Fruit Research Farm Relocation - Phase I
(16) Gregory Hall Elevator Repair
(17) Henry Administration Building - UPS Installation
(18) Housing Sprinkler & Finish Work Upgrades at Busey Evans Phase I
(19) Housing Sprinkler & Finish Work Upgrades at PAR Phase II
(20) Huff Hall North Addition
(21) Illinois Fire Service Institute Learning Resource & Research Center
(22) KCPA West Exterior Stairs Phase II
(23) Law Building Replace Roof
(24) Main Library Rare Book & Manuscript Library HVAC Remediation
(25) Materials Science and Engineering Building Phase II A Remodeling
(26) Medical Sciences Building Ventilation Remediation
(27) Morrill Hall AHU Replacement
(28) Morrill Hall Basement Insectary
(29) Morrill Hall Sprinkler & Fire Alarm Upgrades
(30) Mumford Hall Electrical Systems Replacement
(31) Natural Gas Pipeline Relocation for Curtis Road Rehabilitation - Phase III
(32) Natural History Building Atlas Computer Labs
(33) Natural History Building Chilled Water Distribution for CITES, ATLAS, AUDITORIUM
(34) Natural History Survey Building
(35) NCSA Petascale Computing Facility
(36) Newmark Civil Engineering Building Student Center Addition
(37) Oak Street Chiller Plant & Distribution System
(38) Police Training Institute - Fire Range Upgrade Phase 2
(39) Roger Adams Laboratory Replace AHU
(40) Scott, Snyder, Weston Hall Limited Remodel at Gregory and Peabody Drive Phase I
(41) Smith Memorial Hall Replace Air Handling Units - Phase I
(42) South Campus Wind Turbine
(43) Student Dining / Residential Programs Building - Demolish Existing Dining Halls
(44) Student Dining / Residential Programs Building- Professional Services
(45) Talbot laboratory Roof and Window Replacement
(46) Undergraduate Library Electrical Distribution System Upgrade
= Password Required
Click Here for the Site Map
©Copyright© 2001 University of Illinois at Urbana-Champaign EMail US: FSWebComment