Home
About Deferred Maintenance
Project List
Related Links
Contact Us
News Releases
AFMFA 2009 Selections
Did You Know?
The University of Illinois has an enrollment of more than 40,000 students utilizing more than 500 buildings spanning an area of 7.5 square miles.
Deferred Maintenance Projects (197)
All Projects (to list click here)
Campus Energy Use Reduction (to list click here)
By Building:
NO SPECIFIC LOCATION
1201 W NEVADA, URBANA
1205 W NEVADA, URBANA
805 W PENNSYLVANIA, URBANA
ABBOTT POWER PLANT
ADVANCED COMPUTATION BLDG
AGRICULTURAL ENGR SCIENCES BLDG
ALTGELD HALL
ARCHITECTURE BUILDING
ARMORY
ARMORY AVENUE WAREHOUSE
ART AND DESIGN BUILDING
ART-EAST ANNEX, STUDIO 1
BECKMAN INSTITUTE
BEVIER HALL
BURRILL HALL
CAMPBELL HALL
CERAMICS BUILDING
CHEMICAL & LIFE SCIENCES LABORATORY
CHEMISTRY ANNEX
CHILD DEVELOPMENT LABORATORY
CIVIL ENGINEERING HYDROSYSTEMS LAB
COMPUTING APPLICATIONS BUILDING
DAVENPORT HALL
DAVID KINLEY HALL
DIGITAL COMPUTER LABORATORY
EDUCATION BUILDING
ENGINEERING HALL
ENGINEERING SCIENCES BUILDING
ENGLISH BUILDING
EVERITT ELEC & COMP ENGR LAB
FLAGG HALL
FOELLINGER AUDITORIUM
FOREIGN LANGUAGES BUILDING
FREER HALL
GRAINGER ENGINEERING LIBRARY
GREGORY HALL
HARDING BAND BUILDING
HENRY ADMINISTRATION BUILDING
HORTICULTURE FIELD LABORATORY
ILLINI HALL
KRANNERT ART MUSEUM
KRANNERT CENTER FOR PERFORMING ARTS
LAW BUILDING
LEVIS FACULTY CENTER
LIBRARY
LIBRARY AIR CONDITIONING CENTER
LINCOLN HALL
LOOMIS LABORATORY OF PHYSICS
MADIGAN LABORATORY, EDWARD R
MATERIALS SCIENCE AND ENG BLDG
MECHANICAL ENGINEERING BUILDING
MECHANICAL ENGINEERING LABORATORY
MEDICAL SCIENCES BUILDING
MORRILL HALL
MUMFORD HALL
MUSIC BUILDING
NATIONAL SOYBEAN RESEARCH CENTER
NATURAL HISTORY BUILDING
NEWMARK CIVIL ENGINEERING BUILDING
NOBLE HALL
NOYES LABORATORY OF CHEMISTRY
NUCLEAR PHYSICS LABORATORY
OPTICAL PHYSICS AND ENGINEERING BLDG
PLANT SCIENCES LABORATORY
PSYCHOLOGY LABORATORY
PUBLIC SAFETY BUILDING
REHABILITATION EDUCATION CENTER
ROGER ADAMS LABORATORY
SEITZ MATERIALS RESEARCH LAB
SMITH MEMORIAL HALL
STOCK PAVILION
SURVEYING BUILDING
TALBOT LABORATORY
TRANSPORTATION BUILDING
TURNER HALL
UNDERGRADUATE LIBRARY
UNIVERSITY HIGH SCHOOL
VET MED BASIC SCIENCES BUILDING
VETERINARY TEACHING HOSPITAL
By Funding Source:
Academic Facilities Maintenance Fund Assessment (AFMFA) (59)
Certificates of Participation (COPS) (40)
University Administration (UA) Reserves (98)
By Phase:
Planning (74)
Construction / In Progress (33)
Completed (90)
Home
About Deferred Maintenance
Project List
Related Links
Contact Us
News Releases
©Copyright© 2007 University of Illinois at Urbana-Champaign
Web Comment:
FSWebComment