ABBOTT POWER PLANT |
Replacement of Roof C
|
|
| |
AGRICULTURAL ENGR SCIENCES BLDG |
Campus Wide Chilled Water Conversions
*
|
|
| |
ALTGELD HALL |
Classroom Renovation
|
| |
|
Electric Service Upgrade
*
|
| |
|
Fire Alarm Upgrade
|
| |
|
North Exterior Stair Repair
|
|
| |
ARMORY |
Campus Wide Chilled Water Conversions
*
|
| |
|
Classroom Repairs
|
| |
|
Limited Renovation of Restrooms, Windows, Doors, and Floors
*
|
| |
|
Sprinkler Installation
|
|
| |
ARMORY AVENUE WAREHOUSE |
Warehouse Demoltition
*
|
|
| |
ART AND DESIGN BUILDING |
Metals Instructional Lab Remodel (Contribution)
|
|
| |
BEVIER HALL |
1st Floor Corridor and Classroom 144 & 393 Remodel
|
| |
|
Elevator Modernization
|
| |
|
Infrastructure Phase I
|
| |
|
Renovate Classrooms 108, 166, & 168
|
|
| |
BURRILL HALL |
Infrastructure and First Floor Repairs
*
|
|
| |
CHEMICAL & LIFE SCIENCES LABORATORY |
Chilled Water Conversion
*
|
| |
|
Energy Conservation- VFD Installation
*
|
|
| |
CHEMISTRY ANNEX |
Addition and Renovation
|
| |
|
Electrical Upgrade
*
|
| |
|
Slate Roof Replacement
|
| |
|
Slate Roof Replacement & Asbestos Abatement
|
|
| |
CHILD DEVELOPMENT LABORATORY |
Life Safety Upgrades
|
|
| |
CHILDREN'S RESEARCH CENTER |
Life Safety Upgrades
|
|
| |
COMPUTING APPLICATIONS BUILDING |
Roof Replacement
|
|
| |
DAVENPORT HALL |
Campus Wide Chilled Water Conversions
*
|
| |
|
Chilled Water Connection
*
|
| |
|
Electrical Service Replacement
|
| |
|
Exterior Repairs
*
|
| |
|
Master Plan
|
|
| |
DAVID KINLEY HALL |
Basement Heating Remediation
|
| |
|
Basement Life Safety Upgrades
|
| |
|
Classroom Remodeling
|
| |
|
Classroom Remodeling Phase 2 (Sub-project of Classroom Repairs)
|
| |
|
HVAC and Electrical Remediation (Electrical and Ventilation)
*
|
| |
|
HVAC and Electrical Remediation (Life Safety + Exterior Repairs)
*
|
| |
|
Window Replacement Phase I
|
| |
|
Windows and Exterior Doors
*
|
|
| |
DIGITAL COMPUTER LABORATORY |
Electrical Main Service Replacement and Emergency Lighting
|
| |
|
Replace CITES Conference Rooms L-410 AHUs
|
|
| |
EDUCATION BUILDING |
Classroom Repairs
|
| |
|
Exterior Repairs & Ground Floor Room Renovations (Contribution)
|
| |
|
HVAC Replacement Phase I and II
*
|
| |
|
Lecture Hall Air Handling Unit
*
|
|
| |
ENGINEERING SCIENCES BUILDING |
AHU #2 Replacement
|
| |
|
Exterior Repairs to Roofs and Windows
|
| |
|
Replace AHU 8, 9, & 10
*
|
|
| |
ENGLISH BUILDING |
Courtyard Roof Replacement and Chilled Water Connection
*
|
| |
|
English Building/Gregory Hall Window Replacement Specs
|
| |
|
Interior & Exterior Repairs
*
|
| |
|
Interior & Exterior Repairs (Restroom Contribution)
|
| |
|
Window Replacement
*
|
|
| |
EVERITT ELEC & COMP ENGR LAB |
Electrical Systems Replacement
|
| |
|
Life Safety
|
| |
|
Life Safety Phase II
|
|
| |
FOELLINGER AUDITORIUM |
Campus Wide Chilled Water Conversions
*
|
| |
|
North Roof Replacement
|
| |
|
Seating, Painting and Accessibility
|
|
| |
FOREIGN LANGUAGES BUILDING |
Chilled Water Installation
*
|
| |
|
Exterior Repairs and HVAC Remediation Phase II
*
|
| |
|
Life Safety and HVAC Remediation
*
|
|
| |
FREER HALL |
Accessibility Upgrade
|
| |
|
Third Floor South Gym Remodel (Contribution)
|
|
| |
GRAINGER ENGINEERING LIBRARY |
Controls
*
|
|
| |
GREGORY HALL |
Basement Sprinkler Installation
|
| |
|
Chiller Removal
|
| |
|
Elevator Repair
|
| |
|
HVAC (Contribution from Electrical Service Repair)
*
|
| |
|
HVAC Replacement
*
|
| |
|
Interior Repair Plan Phase II
*
|
| |
|
Repair Plan
|
| |
|
Window Replacement and Tuckpointing
*
|
|
| |
HENRY ADMINISTRATION BUILDING |
Remodel Contribution
|
|
| |
HORTICULTURE FIELD LABORATORY |
Slate Roof Replacement
|
|
| |
HUFF HALL |
Controls Upgrade
*
|
|
| |
KRANNERT ART MUSEUM |
Building Envelope and HVAC Remediation
*
|
| |
|
HVAC Repair (Design)
|
|
| |
KRANNERT CENTER FOR PERFORMING ARTS |
Energy Conservation
*
|
| |
|
Exterior Repairs
*
|
| |
|
Krannert Center for Performing Arts - Energy Conservation Phase II
*
|
| |
|
Life Safety Corrections
|
| |
|
West Exterior Stairs Phase II
|
|
| |
LAW BUILDING |
Replace Roof
|
|
| |
LEVIS FACULTY CENTER |
Energy Conservation- Ventilation
*
|
| |
|
Roof Replacement
|
|
| |
LIBRARY |
Campus Wide Chilled Water Conversions
*
|
| |
|
Gutter + Downspout Replacement
|
| |
|
Phase 2A of the Redevelopment Plan
*
|
| |
|
Phase 2B of the Redevelopment Plan (Contribution)
|
| |
|
Rare Book & Manuscript Library - HVAC Remediation
|
|
| |
LIBRARY AIR CONDITIONING CENTER |
Roof Replacement
|
|
| |
LINCOLN HALL |
Deferred Maintenance Phase 1 - Chilled Water Extension Project
*
|
| |
|
Renovation Contribution
|
|
| |
LOOMIS LABORATORY OF PHYSICS |
Replace Electrical Service
|
| |
|
West Infrastructure Repairs
*
|
|
| |
MATERIALS SCIENCE AND ENG BLDG |
Slate Roof Repair
|
|
| |
MECHANICAL ENGINEERING BUILDING |
Air Handler in Basement
|
| |
|
South Wing Renovation
|
|
| |
MEDICAL SCIENCES BUILDING |
Auditorium Seating Replacement
|
| |
|
Replace Auditorium Ceiling, Air Handling Issues
|
| |
|
Ventilation Remediation
*
|
|
| |
MORRILL HALL |
AHU Replacement
*
|
| |
|
Sprinkler and Fire Alarm Upgrades
|
|
| |
MUMFORD HALL |
Electrical Systems Replacement
*
|
| |
|
Envelope Repair
|
|
| |
NATURAL HISTORY BUILDING |
Chilled Water
*
|
| |
|
Major Renovation Contribution
|
| |
|
Renovation Contribution
|
| |
|
Repair Exterior Envelope
*
|
| |
|
Repair Exterior Envelope (Design)
*
|
|
| |
NEWMARK CIVIL ENGINEERING BUILDING |
Partial Roof Replacement
|
| |
|
Student Center Addition (Deferred Maintenance Contribution)
|
|
| |
NO SPECIFIC LOCATION |
Campus - Fire Alarm Installations - Various Locations
|
| |
|
Campus - Fire Alarm Installations - Various Locations
|
| |
|
Campus - Repair Inverters/Install Generators - Various Locations
|
| |
|
Campus - Replace Exit Signage - LED - Various Locations
|
| |
|
Campus - VFD Replacement - Various Locations
*
|
| |
|
Campus Replace Exit Signage LED FY08 - Various Locations
|
| |
|
Campus Street Repair - Armory Avenue
|
| |
|
Campus Street Repair - Gregory Drive
|
| |
|
Campus Street Repair - Maryland Avenue
|
| |
|
Campus Street Repair - Peabody Drive
|
| |
|
Campus Street Repair - Pennsylvania Avenue
|
| |
|
Campus Street Repair - Street Marking Upgrades
|
| |
|
Campus Wide - Meter Replacement - DDC
|
| |
|
Campus Wide - Meter Replacement - Electrical
|
| |
|
Campus Wide Chilled Water Conversions - Engineering Services
*
|
| |
|
Campus Wide Meter Replacement - Chilled Water
|
| |
|
Campus Wide Restroom Repairs and Upgrades
|
| |
|
Campus-Wide Emergency Projects
|
| |
|
Campus-Wide Meter Controls
|
| |
|
Campus-wide VFD Replacements
*
|
| |
|
Classroom Repairs
|
| |
|
Elevator Upgrades and Related Work
|
| |
|
Energy Reduction Project #1
*
|
| |
|
Energy Reduction Project #2
*
|
| |
|
Energy Reduction Project #3
*
|
| |
|
Energy Reduction Projects 2012
*
|
| |
|
Energy Reduction Projects- Insulation Installation
*
|
| |
|
Grainger Library and Talbot Laboratory Chilled Water Extension
*
|
| |
|
Gregory Drive Storm Sewer Improvements (Contribution)
|
| |
|
Lighting Retrofit #1
*
|
| |
|
Lighting Retrofit #2
*
|
| |
|
Lighting Retrofit #3
*
|
| |
|
MACS Replacement - Phase 1
*
|
| |
|
MACS Replacement - Phase 2
*
|
| |
|
MACS Replacement - Phase 3
*
|
| |
|
Psychology/Speech & Hearing Chiller Water Conversion
*
|
| |
|
Retro Commissioning
*
|
| |
|
Retro Commissioning - FY2009 - Team #1
*
|
| |
|
Retro Commissioning - FY2009 - Team #2
*
|
| |
|
Retro-Commissioning
*
|
| |
|
Retro-Commissioning - FY2010
*
|
| |
|
Retro-Commissioning - FY2011
*
|
| |
|
Small Maintenance Projects - AFMFA 2009
|
| |
|
Small Maintenance Projects - COPS Excess Earnings
|
| |
|
St. Mary's Road - Improvements from Lincoln to Fourth (Contribution)
|
| |
|
Turner Hall, National Soy Bean Bldg and Psychology Bldg - Lighting Retrofit
*
|
|
| |
NOYES LABORATORY OF CHEMISTRY |
Exterior Repairs
*
|
| |
|
West Classroom Renovation
|
|
| |
NUCLEAR PHYSICS LABORATORY |
Partial Roof Replacement
|
|
| |
PSYCHOLOGY LABORATORY |
AHU 3, 8, 9 Upgrades
*
|
| |
|
Controls Upgrade- Final Phase
*
|
| |
|
DDC Controls Upgrade, Phase III
*
|
| |
|
Fan Rehabilitations
*
|
| |
|
Life Safety Corrections
|
| |
|
Roof Replacement
*
|
|
| |
REHABILITATION EDUCATION CENTER |
Infrastructure Repair
*
|
| |
|
Window Replacement
*
|
|
| |
ROGER ADAMS LABORATORY |
Energy Recovery Units
*
|
| |
|
Fire Suppression Renovation
|
| |
|
Mechanical Penthouse In-Fill
|
| |
|
Remodel Lab 316-325 (Contribution)
|
| |
|
Renovation Phase I
|
| |
|
Replace AHU and Controls
*
|
|
| |
SEITZ MATERIALS RESEARCH LAB |
Parapet Wall Repair
|
| |
|
Roof Replacement
|
|
| |
SMITH MEMORIAL HALL |
Infrastructure Repairs
*
|
| |
|
Recital Hall and First Floor Corridor Life Safety Repairs
|
| |
|
Seating Replacement and Infrastructure
|
|
| |
STOCK PAVILION |
Upgrade Power
|
|
| |
TALBOT LABORATORY |
Roof and Parapet Wall Repair
|
|
| |
TRANSPORTATION BUILDING |
Life Safety & Elevator Upgrades
|
|
| |
TURNER HALL |
Controls Work
*
|
| |
|
Elevator Modernization
|
| |
|
Exterior Envelope and Energy Reduction
*
|
| |
|
Soils and Crops Lab Renovation
|
|
| |
UNDERGRADUATE LIBRARY |
Campus Wide Chilled Water Conversions
*
|
|
| |
UNIVERSITY HIGH SCHOOL |
Life Safety Upgrades
|
| |
|
Painting and Flooring Replacement
|
|
| |
VET MED BASIC SCIENCES BUILDING |
Veterinary Medicine Complex Roof Replacements and Duct Cleaning
*
|
|
| |
VETERINARY TEACHING HOSPITAL |
LAC Renovation (Contribution)
|
|
| |
WATER SURVEY RESEARCH CENTER #2 |
Replace Underground Piping
|