| First Street, located between Hazelwood Drive and Gerty Drive. |
| Streets(s) / Sidewalk(s) to be Closed: First Street, located between Hazelwood Drive and Gerty Drive. |
| |
| Description: First Street is scheduled for 2-lane, 2-way traffic in lieu of the normal 4-lane traffic, due to the installation of new sanitary sewer pipe under the road. The road crossing will occur approximately 350 feet south of Hazelwood Drive. |
| |
| Contact Person: Dick Drew (217) 265-6716 |
| |
| Date of Closure: 07/23/07 07:00 AM Date of Reopening: 08/07/07 07:00 AM |
| |
| Reason for Closure: Duce Construction is installing a new 8" sanitary sewer line under First Street, as part of the South Campus Sanitary Sewer Project- Phase 1. |
 |